DSC02266 | DSC02257-small | DSC02251 |
---|---|---|
DSC02252 | Platform | Stair Tower |
Location
Conklin, AB
Completion Date
2012
Tonnage
7500
EPC
WorleyParsons
Owner
MEG Energy
MEG Energy Christina Lake Phase 2B
​New at Supermétal's Western Division in Leduc, Alberta, the construction of platforms and stair towers. Built for WorleyParsons and MEG Energy, we assembled over 30 platforms and 4 stair towers at our Leduc facility. The impressive structural platforms average 20ft width and 50ft in length are shipped to the mod yard for equipment placement or directly to site. We worked closely with the client and mod yard to ensure competitiveness and project schedule compliance.
The platforms are part of a 7500-ton contract that was fabricated between March-December 2011.
The stair tower built measures 74' in length and 24' high. Our steel erection division, Supermetal Construction Inc., was able to assemble the stairs, frame, and hand rail, in a month and was shipped on a 48-wheel heavy haul trailer unit.