Thompson, MB
Completion Date
2012
Tonnage
2500
GC
O.N.E. Partnership
Owner
Manitoba Hydro
Wuskwatim, Manitoba Hydro
Wuskwatim is a 200-megawatt, run-of-river hydroelectric generating station on the Burntwood River at Taskinigup Falls. 800km north of Winnipeg.
Construction of the generating station was completed in late 2012 at a cost of $1.3 billion.
-
2500 tonnes of structural steel.
-
Installed steel structure, cladding and overhead cranes.
-
0 LTI’s
-
project completed on schedule​
-
GC consisted of H.J. O’Connell Limited , Neilson Inc. and EBC Inc.