top of page
Wuskwatum Crane

Wuskwatum Crane

Wuskwatum Wall2

Wuskwatum Wall2

Wuskwatum Aerial

Wuskwatum Aerial

Location

Thompson, MB

Completion Date

2012

Tonnage

2500

GC

O.N.E. Partnership

Owner

Manitoba Hydro

Wuskwatim, Manitoba Hydro

Wuskwatim is a 200-megawatt, run-of-river hydroelectric generating station on the Burntwood River at Taskinigup Falls.  800km north of Winnipeg.

Construction of the generating station was completed in late 2012 at a cost of $1.3 billion.
 

  • 2500 tonnes of structural steel.

  • Installed steel structure, cladding and overhead cranes.

  • 0 LTI’s

  • project completed on schedule​

  • GC consisted of H.J. O’Connell Limited , Neilson Inc. and EBC Inc.